One of the numerous projects completed at Rolls Royce Derby involved the MMC Building. Following the installation of a new roof safety line system, Synergy undertook the cleaning of the gutters and applied a liquid applied coating to approximately 500 linear meters using Giromax Guttercoat.

Derby

External works to the gutters included the removal of the existing corroded outlets and installation of new siphonic outlets

A fully new upgraded siphonic drain water system was installed including a back up secondary overflow system to bring the roof drainage up to current regulations.