Arla Lockerbie is one of our furthest locations to work at so far. The project was divided into three parts, which included the new development of a office block, link corridor and VAT room.
Lockerbie
The VAT Room was made up of a twin skin Euroclad built-up system for the roof and walls, along with mineral wool insulation and new composite membrane gutters at the eaves.
The office block featured Euroclad wall cladding on both the main building and the stair block, which included parapet capping and liner.
Lastly, the link corridor was constructed using Euroclad twin skin built-up wall cladding, also finished with parapet capping’s.